Search

(Type your query in the field above and press enter to search)

DWP Offices, South Shields

3 May 2023 at 2:48 PM

We are delighted to have assisted national award-winning Main Contractor  GMI Construction Group with the completion testing of the new £3.2m Jobcentre Plus offices in South Shields.

The building is now fully operational and saw the current branch in Barrington Street moved to the new purpose-built facility on Mile End Road.

The 12,000 sq ft project targeted a BREEAM Very Good rating and is part of a wider repurposing of South Shields town centre. GMI was awarded the contract by long time client and urban regeneration specialist Muse Developments.

  • Air Permeability Consultancy
  • Air Permeability Testing
  • Thermographic Survey
DWP Offices, South Shields
DWP Offices, South Shields
DWP Offices, South Shields

“Build Energy have been a joy to work with and we have been continually impressed with their responsiveness, proactivity and impressive turn-around times in ensuring that our projects achieve the required performance parameters – all with a friendly single point of contact. We have benefitted from Build Energy’s expert technical advice throughout the design and construction stages through to completion, helping us meet and exceed stringent building regulations requirements. We look forward to continuing our productive relationship in future projects.”

Alex Zimmermann
- Wimshurst Pelleriti

Contact us

We are always there to help. We'd love to hear from you!

Find Us